Casing Tube Suppliers & Manufacturers & Factory

how to choose the right Casing tube Supplier for your project when selecting a casing tube supplier for your project, it is important to consider a number of factors. First, you should consider the supplier’s reputation and experience in the industry. Look for a supplier that has a proven track record of providing quality products

how to choose the right Casing tube Supplier for your project

when selecting a casing tube supplier for your project, it is important to consider a number of factors. First, you should consider the supplier’s reputation and experience in the industry. Look for a supplier that has a proven track record of providing quality products and services. Additionally, you should research the supplier’s manufacturing capabilities and processes to ensure that they are able to meet your project’s requirements.

Second, you should consider the supplier’s pricing structure. make sure that the supplier is offering competitive Prices and that they are willing to work with you to meet your budget. Additionally, you should inquire about any discounts or promotions that the supplier may offer.

Labels a           Calculated Mass c
    Nominal linear Mass T& C b,c wall thick– ness       em, Mass Gain or Loss Due to End Finishing d
  Outside diameter     Inside Diameter Drift Diameter Plain- end kg
              round thread Buttress Thread
            wpe        
  D kg/m t D mm kg/m short long RC SCC
  mm   mm mm            
1 2 3 4 5 6 7 8 9 10 11 12
8 5/8 24 219.08 35.72 6.71 205.66 202.48 35.14 10.93
8 5/8 28 219.08 41.67 7.72 203.64 200.46 40.24 10.07 — 12.44 — 12.57 — 2.51
8 5/8 32 219.08 47.62 8.94 201.2 200.02 e 198.02 195.58 46.33 9.39 12.44 12.57 2.51
8 5/8 32 219.08 47.62 8.94 201.2 193.68 e 46.33 9.39 11.6 11.68 1.62
8 5/8 36 219.08 53.57 10.16 198.76 193.04 52.35 8.72 10.73 10.77 0.71
8 5/8 40 219.08 59.53 11.43 196.22 190.5 58.53 10.73 10.77 0.71
8 5/8 40 219.08 59.53 11.43 196.22 187.6 58.53 9.88 9.87 –0.20
8 5/8 44 219.08 65.48 12.7 193.68   64.64 8.88 8.85 –1.21
8 5/8 49 219.08 72.92 14.15 190.78   71.51      
9 5/8 32.3 244.48 48.07 7.92 228.6 224.66 46.2 11 — 14.48 — 13.87 — 2.74
9 5/8 36 244.48 53.57 8.94 226.6 222.63 51.93 10.36 13.59 12.97 1.84
9 5/8 40 244.48 59.53 10.03 224.4 222.25 e 220.45 218.41 218.41 216.54 216.54 57.99 9.69 13.59 12.97 1.84
9 5/8 40 244.48 59.53 10.03 224.4 215.90 e 57.99 9.69 12.78 12.15 1.01
9 5/8 43.5 244.48 64.74 11.05 222.4 215.90 e 212.83 212.83 63.61 12.84 f 12.15 1.01
9 5/8 43.5 244.48 64.74 11.05 222.4 212.72 e 63.61 12.03 11.39 0.25
9 5/8 47 244.48 69.94 11.99 220.5 212.72 e 210.29 210.29 209.58 206.38 203.23 200.02 68.75 12.09 f 11.39 0.25
9 5/8 47 244.48 69.94 11.99 222.5   68.75 10.57 9.92 –1.22
9 5/8 53.5 244.48 79.62 13.84 216.8   78.72 10.63 f 9.92 –1.22
9 5/8 53.5 244.48 79.62 13.84 216.8   78.72 10.57 9.92 –1.22
9 5/8 53.5 244.48 79.62 13.84 216.8   78.72 10.63 f 9.92 –1.22
9 5/8 53.5 244.48 79.62 13.84 216.8   78.72 9.58 8.92 –2.22
9 5/8 58.4 244.48 86.91 15.11 214.25   85.47 9.65 f 8.92 –2.22
9 5/8 58.4 244.48 86.91 15.11 214.25   85.47 9.58 8.92 –2.22
9 5/8 58.4 244.48 86.91 15.11 214.25   85.47 9.65 f 8.92 –2.22
9 5/8 58.4 244.48 86.91 15.11 214.25   85.47
9 5/8 59.4 244.48 88.4 15.47 213.5   87.37
9 5/8 64.9 244.48 96.58 17.07 210.3   95.73
9 5/8 70.3 244.48 104.62 18.64 207.2   103.82
9 5/8 75.6 244.48 112.51 20.24 204   111.93    

Third, you should consider the supplier’s customer service. Make sure that the supplier is willing to answer any questions you may have and provide timely responses. Additionally, you should inquire about the supplier’s return policy and warranty information.
Oil Tube chinese high-quality Factory,casing Pipe china best Supplier,
Finally, you should consider the supplier’s delivery times. Make sure that the supplier is able to meet your project’s timeline and that they are willing to work with you to ensure that your project is completed on time.

alt-747
By considering these factors, you can ensure that you select the right casing tube supplier for your project. Doing your research and taking the time to evaluate potential Suppliers will help you make an informed decision and ensure that your project is completed successfully.

The benefits of Working with Experienced Casing Tube manufacturers & Factory

chemical Composition, Mass Fraction (%)
grade   C Mn Mo Cr Ni Cu P S Si
  type min max min max min max min max max max max max max
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
H40 0.03
J55 0.03
K55 0.03
N80 1 0.03 0.03
N80 Q 0.03 0.03
R95 0.45 c 1.9 0.03 0.03 0.45
L80 1 0.43 a 1.9 0.25 0.35 0.03 0.03 0.45
L80 9Cr 0.15 0.3 0.6 0.9 1.1 8 10 0.5 0.25 0.02 0.03 1
L80 13Cr 0.15 0.22 0.25 1 12 14 0.5 0.25 0.02 0.03 1
C90 1 0.35 1.2 0.25 b 0.85 1.5 0.99 0.02 0.03
T95 1 0.35 1.2 0.25 b 0.85 0.4 1.5 0.99 0.02 0.03
C110 0.35 1.2 0.25 1 0.4 1.5 0.99 0.02 0.03
P110 e 0.030 e 0.030 e
Q125 1 0.35   1.35 0.85 1.5 0.99 0.02 0.01
NOTE elements shown shall be reported in product analysis.
a The carbon content for L80 may be increased up to 0.50 % maximum if the product is oil-quenched or polymer-quenched.
b The molybdenum content for Grade C90 Type 1 has no minimum tolerance if the Wall thickness is less than 17.78 mm.
c The carbon content for R95 may be increased up to 0.55 % maximum if the product is oil-quenched.
d The molybdenum content for T95 Type 1 may be decreased to 0.15 % minimum if the wall thickness is less than 17.78 mm.
e For EW Grade p110, the phosphorus content shall be 0.020 % maximum and the sulfur content 0.010 % maximum.

Similar Posts